Solar Alliance AG (Ladeinfrastruktur)
Wallisellen
Tap a star to rate
Solar Alliance AG treats charging infrastructure as an extension of its photovoltaic business: companies that already have a solar system on the roof can route the electricity generated straight into the company fleet with a smart load management system. AC charge points (7 to 22 kW) and DC fast chargers (50 to 600 kW) are matched individually to the site.
Solar Alliance handles project management from site planning and load-bearing analysis through permits to installation and maintenance. As part of the TSG Group, the company has access to further specialists in energy and infrastructure.